MJS Mechanical Project Spotlight
Strathcona-Tweedsmuir School Sanitary Replacement
Schedule: Jul 2020 – Sept 2020
Prime Contractor: MJS Technical Services
Mechanical Contractor: MJS Technical Services
Engineer: Remedy Engineering
Project Description
The facility team had indicated that there was a sewer odor in the change rooms of the school, after other attempts to identify and correct these issues it was determined that the underground sanitary was interrupted and needed repair. After classes ended for the summer of 2020 MJS placed a crew on site to cut and remove the concrete slab and began to excavate where the buried sanitary line was thought to be. MJS excavated and replaced roughly 700’ of below grade sanitary, backfilled, prepped and placed concrete in time to turn the job over to the facility team to complete the finishes in time for school to commence in September.