Schedule: Jul 2021 – Sept 2021
Prime Contractor: MJS Technical Services
Mechanical Contractor: MJS Technical Services
Engineer: Remedy Engineering
Project Description
Although the school is relatively new, the pre-existing boilers had been giving the owner troubles for a long period of time, without being able to identify a repair to the problem it was decided to replace the original boilers. The old boilers were disconnected and removed from site and two new boilers were installed in their place. Minimal piping had to be redone, but even so we were ecstatic with the result. Our on-site team knocked another one out of the park.